Core Storage Upgrade (HW Supply)
Primary Contractor
![xalq-bank-e1496989823253](https://fcc.az/wp-content/uploads/2018/02/xalq-bank-e1496989823253.jpg)
Project Scope
Bank infrastructure is growing day by day, data grow even faster. It is always a challenge to maintain the balance of spare capacity and its cost. The existing IBM Storwize was a very smart investment choice from the beginning, now it is was smoothly and easily upgraded with new expansion exposures and disks.
Hardware products used
IBM Storwize